Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Commission approves Plum (Flam) Road resurfacing plan with off-street path; staff to consider merge ramps

6404071 · October 9, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Transportation Commission approved Option 3 for Flam (Plum) Road reconstruction, removing on-street parking, adding an 8–10 foot off-street path north of the roadway, and creating bus-loading features near La Follette; the motion asked staff to consider adding bike-path merge ramps where feasible.

The Transportation Commission on Oct. 8 approved a revised design for the Flam Road resurfacing and assessment district that narrows vehicle lanes, removes on-street parking, and installs an 8–10 foot multiuse off-street path on the north side of Flam Road to connect to existing shared-use paths on Monona Drive.

Engineering staff presented three options and a public survey of residents and stakeholders. Staff said Option 3 — the preferred design — received the broadest support in the commission’s outreach (about 60% supportive in the questionnaire) and was presented as the city’s recommendation.

What the approved design includes: engineering said the project will reconstruct utilities and replace curb and gutter as needed; remove on-street parking along Flam Road; provide an off-street 8–10…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans