Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Site Plan Parking Lot topic

No spam. Unsubscribe anytime.

Commission approves new concrete parking lot at Commerce Avenue site

6438800 · October 21, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning Commission approved a site plan to replace a truck well and asphalt with a new concrete parking lot at 11801 Commerce Ave., subject to standard planning conditions including revised site data, landscape plans, recorded ingress/egress agreements and a performance bond.

The Planning Commission voted to approve a site plan for a new concrete parking lot at 11801 Commerce Avenue on Oct. 20, subject to standard planning conditions addressing site data, landscaping, ingress/egress documentation and a performance bond.

Surveyor and engineer Jeff Rizzo of Fenn and Associates presented the proposal on behalf of property interest. The project replaces an existing truck well and asphalt pavement, relocates a trash enclosure, and organizes existing dumpsters; staff noted the work began as a storm sewer replacement and evolved into a full pavement and drainage replacement project. Utility providers (Comcast, DTE) raised no objections but DTE advised care around overhead facilities.

Planning staff’s conditions require updated site-data charting (business type), dimensioning of a cell-tower lease area and access easement information, replacing pavement in a front setback area with lawn and landscaping rather than parking, clarifying use of a rear gravel area (possible ZBA variance), providing dimensions and notes for additional dumpsters, and adding two landscape plans and recorded ingress/egress documents with abutting owners. A performance bond of $3,780 was required based on an estimated cost of $126,000.

Commissioners approved the staff-recommended conditions and directed staff to receive revised drawings and documentation before releasing the plan to the building division.