Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Wireless Infrastructure topic

No spam. Unsubscribe anytime.

BZA approves 260‑foot cell tower near Jalapa to add coverage and capacity along State Route 15

5812590 · September 10, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Grant County's BZA approved construction of a 260‑foot wireless tower near Jalapa to address coverage and capacity issues along SR‑15 and nearby areas; the board recorded unanimous approval with standard permit and FAA documentation conditions.

The Grant County Board of Zoning Appeals voted Sept. 8 to approve a 260‑foot wireless tower near Jalapa (southwest of County Road 400 West and County Road 500 West) after the applicant presented engineering, fall‑zone analysis and coverage maps showing improved service and capacity for the surrounding area.

Applicant counsel Russell Brown and site acquisition representatives said Verizon Wireless will be the confirmed top tenant. The proposed compound is a 75‑by‑75 fenced enclosure with ground equipment; the applicant provided an engineer‑stamped fall‑zone letter showing the structure is designed to collapse within the parent parcel in extreme conditions. The applicant said no suitable collocation options existed within two miles to meet the capacity and coverage needs.

The board had no public opposition during the hearing and heard a brief discussion about inspection and FAA requirements. The approval included a requirement to provide FAA determinations and to proceed through the county's building‑permit inspection process before construction begins.

The motion to approve passed on unanimous roll call.