Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Board approves local upgrade for septic repair at 50 Clear Pond Road, requires groundwater verification
Summary
Lakeville approved a local upgrade for a septic repair at 50 Clear Pond Road with variances for separation to groundwater and for using a single test hole; approval contingent on open‑hole inspection and potential pump installation if groundwater is higher than expected.
The Lakeville Board of Health on Sept. 17 approved a local upgrade and variances for a septic repair at 50 Clear Pond Road, but conditioned the approval on on‑site verification of groundwater elevation.
Darren Kalis of Foresight Engineering told the board that recent soil logs showed the groundwater or saturated soils higher than during a 1996 evaluation and that the design team is requesting a reduction of the required separation to 3 feet and a waiver to accept a single test hole. “So that being the case with the existing plumbing...we're…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

