Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure Maintenance topic

No spam. Unsubscribe anytime.

Poulsbo council approves $35,520 engineering contract to assess Austin Velstad Pavilion

5778382 · September 17, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Council authorized a $35,520.90 Railstar Engineering contract, funded with lodging‑tax advisory committee funds, to perform a structural condition and load‑capacity assessment of the Austin Velstad Pavilion before year end.

The Poulsbo City Council voted to authorize a $35,520.90 contract with Railstar Engineering to conduct a condition assessment of the Austin Velstad Pavilion at Waterfront Park.

Jeff Osmek, parks and recreation director, told the council the work — funded through the lodging tax advisory committee because the pavilion is a tourism draw — will evaluate timbers, joists and load capacities for seismic, wind and snow loads and recommend priority repairs to extend the structure’s life. Staff told the council the work must be completed by the end of the calendar year.

Osmek said five firms responded to the city’s request for proposals and that Railstar was selected on qualifications after staff discussions with top candidates. Councilmembers noted the pavilion, which staff believes was built in the 1970s, is showing wear and has required periodic repairs. Councilmember Eckert said the structure is “starting to show its age” and recalled a recent incident in which staff restricted part of the stage because of a failing board.

A motion to approve the contract was made and seconded; the council approved it by roll call: Taber, aye; Eckert, aye; McVeigh, aye; Crow, aye; Newell, aye.

Why it matters: Austin Velstad Pavilion is one of the city’s primary waterfront gathering sites. The structural assessment will inform repairs and any needed safety restrictions.

Next steps: Staff will finalize the contract with Railstar and proceed with the assessment, then report back to the council with findings and recommended repairs or priorities for funding.