Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Bridge Reconstruction topic
No spam. Unsubscribe anytime.
UDC grants final approval for Arthur Ashe Boulevard bridge reconstruction with design refinements
Summary
The committee gave final approval to the design for the Arthur Ashe Boulevard bridge reconstruction, endorsing refined shade structures, perforated panels and shared-use path widths after subcommittee review.
Get email alerts on the Bridge Reconstruction topic
No spam. Unsubscribe anytime.
The Urban Design Committee on Sept. 11 granted final approval to the Arthur Ashe Boulevard bridge reconstruction plans, following a subcommittee review that refined shade structures, pedestrian elements and lighting details.
Project designers presented a revised scheme that tightened and symmetrized overhead shade elements, added provisions for pedestrian seating and planting maintenance, and allowed for an optional gateway art piece above the roadway. Timmins Group principal and landscape architect Scott Wiley thanked subcommittee members and noted the design intentionally allows the bridge to read as a civic gateway whether or not the art piece is ultimately funded. The project includes dual shared-use paths on the bridge (a 14-foot clear width on the west side and a 10-foot clear width on the east), benches, lighting, and powder-coated steel shade structures with perforated-metal panels intended to provide daylight patterns on the bridge surface.
Committee discussion focused on maintenance responsibility for plantings, finish and color of powder coating for structural elements, bench design (committee members debated armrest/divided seating features), and ensuring non-reflective, matte finishes to avoid glare. The design team said maintenance approaches are in development and acknowledged that funding or maintenance contracts (city, private or via partnerships) will be needed to sustain plantings and site elements.
Committee members praised the collaborative subcommittee process and the visual clarity of the refined design. A motion to approve the final design was passed unanimously. Staff will coordinate next steps for maintenance planning and fabrication details with the applicant and relevant city departments.
