Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Commission issues Negative 3 determination, with condition, for septic upgrade at 132 Bedford Street
Summary
After a presentation from an engineer, the commission closed the hearing and issued a Negative 3 Determination for a septic system upgrade at 132 Bedford Street, conditioned on installing erosion‑control to define the limit of work and providing updated plans.
The Lakeville Conservation Commission closed the hearing on a septic system replacement at 132 Bedford Street and voted to issue a Negative 3 Determination with a condition requiring an erosion‑control limit of work and updated plans.
Will Connolly of CEO Consulting Engineers described the project, saying the site contains “an existing 2‑bedroom dwelling, and…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

