Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Land Use Development topic

No spam. Unsubscribe anytime.

Post Falls planning commission approves Harvest Meadows PUD and 85‑lot subdivision with conditions

5742608 · September 8, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning Commission approved the Harvest Meadows planned unit development and its associated subdivision, approving 85 single‑family lots on about 11.2 acres and adding conditions that require phase‑by‑phase completion of open space, HOA funding for private infrastructure, and a small playground in the common area.

The Post Falls Planning Commission voted to approve the Harvest Meadows planned unit development (PUD) and the related subdivision, allowing Blackwell Homes’ Harvest Meadows project to move forward as an 85‑lot single‑family residential development.

The commission approved the PUD (file PUD 25‑2) and the subdivision (file SUBD 25‑4) after extended public testimony and a second hearing by the developer. The approvals include amended conditions introduced during deliberations: (1) phases 1 and 2 — including their shown common‑area open space tracts — must be completed before work on phase 3 begins; (2) the final plat must not exceed 85 buildable lots (excluding common tracts); (3) the project’s homeowners association must maintain all common areas including private roads and alleyways and supply a funding mechanism for long‑term capital repairs and replacement; and (4) the developer will provide a play structure in one of the open‑space tracts.

Why it matters: The project aims to supply smaller, more attainable starter homes inside the city while preserving open space and improving local connectivity. Neighbors and commissioners focused much of their questioning on parking counts, long‑term maintenance of private streets and common areas, and how amenities in shared tracts would be guaranteed and funded.

Key facts and what the commission decided - Location and scope: Harvest Meadows is proposed on about 11.2 gross acres between Guyatt Road and Spokane Street. The plan before the commission proposed 85 single‑family lots (7.36 dwelling units per acre) in three phases. - Parking and circulation: The developer and staff said the plan provides 114 on‑street parking stalls and roughly 340 off‑street parking stalls (two‑car garages plus driveways), and includes an internal street network connecting to Spokane Street and Tennessee Avenue to improve circulation and emergency access. - Lot sizes and deviations: The PUD requests reductions from the R‑2 minimum lot size of 4,000 square feet down to 2,800 square feet on some lots and a limited right‑of‑way reduction (from 65 to 60 feet) compensated by a wider drainage/utility easement. The commission’s approval ties the lot count to a maximum of 85 buildable lots rather than an acreage‑based density cap. - Open space and amenities: PUD rules require at least 10% open space; staff and the applicant said Harvest Meadows meets that requirement on the gross acreage. Commissioners added a condition requiring the developer to install a play structure in one common area tract to address recreational needs for children who will live on small lots. - HOA and long‑term maintenance: Commissioners amended the staff conditions to require the HOA to maintain all common areas (including private streets, alleyways, landscape and irrigation, and snow removal) and to demonstrate a funding mechanism for long‑term capital repair and replacement (sinking fund or similar) before final approvals.

Public comment and developer response Supporters (scores of residents and local housing advocates) told the commission the project would provide needed entry‑level homeownership opportunities for local workers and families. Maggie Lyons of Panhandle Affordable Housing Alliance described the value of higher‑density starter developments and noted deed‑restriction and program partnerships that can preserve long‑term affordability in other projects.

Opponents raised quality‑of‑life concerns: narrower lots, small backyards, potential traffic impacts on Spokane Street and Tennessee/Echo Drive, and long‑term risks from private streets that could impose future costs on homeowners or the city. Several residents asked that the city require a capital reserve or ‘‘sinking fund’’ so future repaving or repairs do not fall to homeowners unexpectedly.

Applicant’s response: Merle Van Houten, the applicant, said the plan was revised after the commission’s June hearing — reducing the lot count from 92 to 85, widening some lot fronts to allow two‑car garages, increasing driveway widths to better meet parking needs, and rearranging open space and snow‑storage tracts. Van Houten said the revisions increased off‑street parking and met code parking requirements while preserving open space and connecting sidewalks and trails to Spokane Street.

Commission deliberations and vote Commissioners and staff discussed snow‑storage, the adequacy of utilities (East Green Acres Irrigation District water; City of Post Falls sewer), parking cross‑sections, and phasing guarantees for open areas. After debating additional conditions, the commission first voted to approve the PUD and then approved the subdivision with the amended conditions described above. Both motions passed on roll call with unanimous affirmative votes by the commission members present (6‑0 on each vote, per the meeting roll call recorded in the transcript).

What’s next The developer will proceed to final plat and construction‑plan submittals consistent with the approved PUD and subdivision conditions. Staff will prepare the written reasoned decisions and relevant agreements that memorialize the phasing, HOA obligations, and the requirement to complete phase‑level open space before subsequent phases begin.

Ending note Commissioners repeatedly stressed the importance of clear, enforceable language in development agreements and plat documents to ensure the open‑space and maintenance commitments are realized over the long term.