Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Public Spaces Downtown topic

No spam. Unsubscribe anytime.

Council reviews downtown study tour; discusses ice‑ribbon, plazas and transit connections

5742584 · September 9, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After a consultant’s draft and a summer tour of regional projects, Orem council and staff discussed plaza designs, multi‑use ice ribbons, transit coordination and options to reduce parking bisecting public space.

Orem City Council members and staff spent significant time on a draft downtown study that followed a summer tour of several Utah public‑space projects. The presentation focused on ideas for making Orem’s downtown public spaces more usable year‑round, including multi‑use plaza areas, ice ribbons that can double as winter skating rinks and summer event space, and ways to reduce the visual and pedestrian barrier created by surface parking.

Staff described features observed at Pierce Harriman and at a nearby ballpark plaza: a central plaza with a stage/pavilion that doubles as a winter skating surface, adjacent retail aimed at local businesses, and design details staff said were relevant to maintenance and operations such as garage access for ice maintenance equipment and avoiding deciduous trees near ice surfaces. Council members and staff discussed possible adaptations for Orem, including: - A ribbon promenade with a wider “knuckle” area or end plaza that could host a bandstand and be flexible for concerts, markets or an ice ribbon in winter - Dual‑use turf areas and mechanical systems that allow both turf and ice in the same footprint - Maintaining pavilions and seating to support family‑oriented events and safe transitions between pool, shell and plaza programming - Working with Utah Transit Authority (UTA) to align bus stops and schedules with event timings

Council members asked the consultant to refine the draft to better reflect local constraints and recommended follow‑up steps: coordinate with UTA on service and soft stops, engage parks maintenance early for operability comments, and study how long‑term property acquisition (if available) could be used proactively to expand contiguous public space. No formal action was taken; staff said they would return to the consultant with the council’s feedback.