Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Subdivision topic

No spam. Unsubscribe anytime.

Hooper planners grant final approval for Swayze Subdivision; utility adjustments noted

5588438 · August 15, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning Commission granted final approval for the one-lot Swayze Subdivision (Parcel 080420075) for Braden Swayze after Technical Review Committee sign-off and confirmation of utility service letters.

The Hooper Planning Commission granted final approval for the Swayze Subdivision, a proposed one-lot subdivision of about 1.81 acres in the city’s R-1 zone, for Braden Swayze. Planning staff and the Technical Review Committee recommended approval after processing minor utility adjustments.

Why it matters: Final plat approval allows the applicant to proceed with construction subject to satisfying standard conditions such as frontage improvements, utility installations and placement of a land-use separation fence. The subdivision will be developed at a proposed residence location near 5733 West 3800 South and is recorded on Parcel 080420075 in the planning packet.

Planning staff told the commission the development is a one-lot subdivision of approximately 1.81 acres. The Technical Review Committee reviewed the plat and utility plan; staff noted the proposed frontage improvements will align with an existing subdivision sidewalk and that the applicant will install curb, gutter and sidewalk along the property frontage. Staff also described adjustments made to utility alignments: sewer and both water lines were moved and the driveway approach was shifted to the east side of the lot so the proposed home could be placed in the intended location.

A staff member said the review yielded no unresolved utility problems and that all ‘‘will serve’’ letters were in from the water, irrigation, power and sewer providers. The staff member said, “All final will serve letters are in from everyone that's super significant,” and recommended approval with the standard conditions described in the packet.

The commission asked whether the land-use separation fence would be installed; staff confirmed the plan calls for removal of an existing small fence on the west side and installation of a standard separation fence. Commissioner Bates moved to grant final approval for the Swayze Subdivision (Parcel 08-042-0075) for Braden Swayze; Commissioner Greener seconded. The motion carried.

Next steps: With final approval, the applicant may proceed with required frontage work and utilities per the plat and the conditions in the staff memo. Staff and the Technical Review Committee will continue to coordinate final utility connections and construction inspections.