Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Planning board continues public hearing on proposed Lakeville fire station at 28 Precinct Street
Summary
Parr Corporation presented a 17,040-square-foot, six-bay fire station design; conservation approval and peer review are complete but MassDOT comments and questions on signage, access and employee gate remain. The board continued the hearing to Aug. 14, 2025.
Parr Corporation presented plans on July 24 for a proposed Lakeville fire station at 28 Precinct Street. Spencer Linz, civil site design engineer for Parr, described a 17,040-square-foot, six-bay building with approximately 40 parking spaces, an underground stormwater infiltration system, a septic system (approved by the Board of Health), and site features including a transformer, generator pad, propane tank and a future training area.
Linz said the project has conservation-commission approval and has completed peer review on stormwater and erosion-control measures; he told the planning board the design attenuates stormwater and in some…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

