Summary

Facilities staff brought a run of building repairs and upgrades to the July 21 CIP committee, including humidifier repairs at City Hall, phased roof work at Public Safety, apron repairs at Fire Station 1 and HVAC/control upgrades at the Jefferson ramp and airport terminal.

Facilities and engineering staff presented a set of capital and maintenance requests affecting multiple city buildings at the July 21 CIP committee meeting.

Key items presented included: • City Hall: staff asked for funds to assess and then repair exterior masonry and entrance features (consultant assessment suggested at about $40,000) and to repair or replace building humidifiers that have contributed to interior veneer delamination; a priority request for first‑floor carpet tile repairs (trip‑hazard mitigation) is also included. • Public Safety building: exterior vestibule overhangs and decorative elements need restoration; staff also indicated the public safety building has multiple roof sections slated for phased replacement and that the first phase has funding in the 2025 budget but not yet completed in construction season. • Fire Station 1: apron and drive repairs are proposed in two phases because mobilization and vehicle access must be managed; staff noted coordination with upcoming Grand Avenue reconstruction is needed before the front apron work begins. • Jefferson Parking Ramp: control and temperature systems are aging and use a vendor system no longer supported; staff proposed consolidating controls onto the city standard so remote monitoring and maintenance are simpler — condo agreements for retail suites may affect cost sharing. • Airport terminal HVAC: the airport currently lacks integrated remote temperature controls; staff proposed installing remote monitoring so after‑hours issues can be diagnosed without on‑site staff calls.

Committee members asked staff to correct several multi‑year budget lines (make assessment vs construction years clear), confirm what work already has 2025 funding (for example public safety chiller), and coordinate with other departments to identify potential cost‑sharing with condo owners or alternative funding. Several members emphasized that some repairs (for example humidifier repair and veneer delamination) should be completed before cosmetic repairs so the fixes are durable.