The Manvel Parks Board voted to recommend that city council approve the design and a not-to-exceed $162,000 equipment purchase and to submit a 2025 GameTime Community Champions grant (manufacturer rebate/discount) application for Heritage Park playground equipment.
Get email alerts on the Park Playground topic
No spam. Unsubscribe anytime.
The Manvel Parks Board on Oct. 16 voted to recommend that the City Council approve the design, a not-to-exceed equipment amount of $162,000, and the submission of a 2025 GameTime Community Champions grant application for playground equipment at Heritage Park.
The recommendation follows a presentation by Tim Duckworth of Cunningham Recreation, representing GameTime Playgrounds, who reviewed the proposed layout, color palette and a two-part pricing structure that separates equipment purchase from later installation. Duckworth told the board the equipment-only quote is $161,081.54 and the separate installation quote is $86,466.95; together those two items total $247,548.49. He said a poured-in-place concrete curbing and drainage add-on from the vendor would add about $43,465, bringing the turnkey total to approximately $291,013.49. Duckworth said GameTime is offering a manufacturer matching amount listed on the quote as a rebate or discount of $95,343.
Board members asked detailed questions about surfacing, accessibility, warranties, drainage and shade. Duckworth said poured-in-place rubber surfacing is ADA-compliant on installation, while engineered wood fiber typically reaches ADA compliance after two to three months of compaction. He provided ballpark surfacing costs: engineered wood fiber about $8–$9 per square foot up front, poured-in-place rubber about $30–$36 per square foot. He also said the playground footprint is roughly 4,900 square feet and includes four 16-foot shade structures.
Duckworth described materials and maintenance: uprights are powder-coated, hardware is stainless, plastics carry a 10-year warranty and some metal and structural components have a limited lifetime warranty; individual components are replaceable rather than requiring full-unit replacement. He also explained drainage and geotextile sublayers for engineered wood fiber and noted that a signed purchase order for the equipment would be needed by Nov. 15 to receive the manufacturer rebate/discount referenced in the quote.
After discussion, a board member moved to recommend council approval of the design, the not-to-exceed amount and the grant application; another member seconded. The board voted in favor and the motion passed. The board’s recommendation will go to City Council for final approval and any required budget or purchase-order action.
The vendor presentation and board discussion made clear several implementation conditions: (1) the equipment-price discount is a manufacturer rebate/discount shown on the quote (not a separate grant payment to the city); (2) the equipment purchase must be completed by a vendor deadline to secure that discount; (3) the installation surfacing choice and any concrete curbing/drainage work can be determined later, and the installation quote may be updated when the city is ready for installation; and (4) staff will bring the board’s recommendation to council for the formal grant-application and purchasing approvals.
Votes at a glance: The Parks Board approved a motion recommending council approval of the design, a not-to-exceed equipment amount of $162,000, and submission of the 2025 GameTime Community Champions grant application for Heritage Park playground equipment; motion passed.