Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Selectboard seeks engineering quotes for Moose Mountain bridge and Tumbledown Deck culvert
Summary
Brookfield Selectboard voted to ask engineering firm Beta for formal quotes for design, permitting and bid packages for repairs to Moose Mountain Bridge and the Tumbledown Deck culvert after reviewing a preliminary study by Stratford Regional Planning.
BROOKFIELD TOWN — The Brookfield Selectboard voted to ask engineering firm Beta for formal cost proposals to produce design, permitting and bid documents for two infrastructure projects: a rehabilitation of the Moose Mountain Bridge and replacement of a culvert on Tumbledown Deck Road.
At the Selectboard meeting, board members said they had reviewed a preliminary report prepared through the Stratford Regional Planning Commission and that the bridge work appeared more straightforward than they had feared. A speaker identified in the record as a staff member said the bridge’s primary problems were “design flaws” rather than the underlying structure and urged fixing what exists to minimize disturbance to adjacent property. “Keeping property disturbance to a minimum and fixing what’s there,” the staff member said, “there’s really nothing wrong with the bridge other than its design flaws.”
Why it matters: The board said the projects…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

