Board approves variance for accessory structure at 251 Denney Hill Road; house must be commenced before final

5587822 · August 14, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A variance allowing a larger, partially open accessory structure at 251 Denney Hill Road was approved 4-0 with the county clarifying building-permit sequencing so the accessory structure cannot receive final sign-off until the principal dwelling is under construction and finaled.

Cherokee County approved a variance allowing an accessory structure at 251 Denney Hill Road that exceeds 50% of the principal structure size and to permit bays that are not wholly enclosed, subject to permitting rules that tie accessory-structure permits and final inspections to the primary dwelling.

Staff described the 6.13-acre parcel and explained Article 5 standards that normally limit accessory structures to 50% of a principal building and require certain placement and enclosure if located closer to the front lot line. The applicant said he plans a smaller principal home and needs a carport/garage with three bays to accommodate family drives, mowers and equipment; the lots topography, septic location and existing stream buffers limit feasible locations.

Applicant Brandon McKay told the board he is building a smaller home and needs covered vehicle storage; he said the proposed structure will fit the rural character and would not obstruct views from the public road. Planning staff and county permitting staff clarified that the accessory-structure permit will not receive final approval or a certificate of occupancy until the house permit has at least commenced and the house final is achieved. Board members discussed that sequencing and confirmed the condition.

The board voted 4-0 to approve the variance as presented.

Speakers: Dana (planning staff), Brandon McKay (applicant), Board members.