Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Active Transportation topic

No spam. Unsubscribe anytime.

Commissioners approve $20,000 survey for Harriet Street pathway design to improve school walking route

5716540 ยท September 4, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

To support a grant application and plan a safer walking route for students, the board approved a $20,000 survey for a Harriet Street pathway; commissioners discussed alignment options and potential crosswalk improvements.

The Dare County Board of Commissioners approved a $20,000 survey on Sept. 3 to advance a proposed Harriet Street pathway connecting the back of Manteo Middle School toward Highway 64.

County staff said a survey and preliminary design are required to be competitive for available grants; the survey will examine the most feasible alignment, drainage constraints and right-of-way options on the south side of the road. Staff described two basic alternatives: build the path on the side of the road nearest the school or shift the travel lanes where the right-of-way allows so the path can be placed on the opposite side. Commissioners instructed staff to pursue the south-side survey first and to include crosswalk and pedestrian-safety treatments in eventual design work.

The board authorized the survey by unanimous vote and directed staff to consider safety measures in the design phase, including marked crosswalks, lighting and signalized crossing features if the alignment requires students to cross the roadway.

Ending: Staff said the survey results will inform a future grant application and design, and the board authorized the county to pay the survey cost from available capital or grant-matching funds.