Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Commission approves Wavecrest Trail sign program with cap on interpretive panels

6490352 · September 10, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission approved a sign program and sign permit for Coastside Land Trust’s Wavecrest Phase 2 trail south of Poplar Beach, reducing the number of interpretive signs after commissioner concerns; approval includes added coastal‑access signage at stair bases and is conditioned on materials and maintenance plans.

The Half Moon Bay Planning Commission on Sept. 9 approved a sign program and sign permit for the Coastside Land Trust’s Wavecrest Phase 2 trail, allowing wayfinding, interpretive and coastal‑access signs along roughly 3 miles of new trail south of Poplar Beach. The commission approved the program with an amendment reducing the number of interpretive panels and adding two required signs at the base of new stairways to indicate public access.

Planning staff Scott Phillips told commissioners the proposed program initially included 49 signs that require a sign permit (not counting standard parking, disabled‑access and restroom signs). The package includes two vehicle directional signs on Redondo Beach Road, orientation maps at trailheads, smaller post signs at trail intersections,…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans