Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Historic Preservation:local Alterations topic

No spam. Unsubscribe anytime.

Commission approves Perry Hall School alterations with material and location conditions

5374249 · July 11, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Baltimore County LPC approved alterations to the former Perry Hall School — loading dock conversion, new entry — subject to staff‑recommended materials and placement conditions.

The Baltimore County Landmarks Preservation Commission approved proposed exterior changes at the former Perry Hall School, with conditions requiring specific materials and placement for the new openings.

Staff described the school (9317 Beller Road) as a 1928 Colonial Revival school recently moved from the preliminary to the final landmarks list. The applicants sought to convert a rear loading dock into a landing and replace a band of windows on the east elevation with a new entry and stairs. Staff recommended using a black metal panel instead of vinyl for a panel above the windows, moving the proposed side entry to match the location shown on submitted plans (around the corner), and specifying concrete landings with metal railings rather than wood.

Commission discussion focused on visibility and egress concerns. Commissioners agreed staff’s recommended material change and preferred the entry location around the corner to preserve the visible elevation; they also added a condition that all exterior landings be concrete with metal railings. Commissioner John Holman moved to approve staff recommendations; the motion carried on a roll‑call vote.

Action: Commission approved the proposed alterations with the modifications above. No registered public speakers or written testimony were submitted for this item.