Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Lumen proposes premanufactured 'fiber huts' and generators at Ballenger Creek site

5065748 · June 23, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Level 3/Lumen presented a plan to add two 24x36-foot prefabricated huts, one 12x36 single-wide unit, two generators and upgraded power at 315 Ballinger Center Drive to expand fiber capacity as part of a nationwide initiative; work expected to take about 60 days and generators will be tested weekly for 15 minutes.

Sherry Kelly, case planner with the Frederick City Planning Department, introduced an application from Lumen (Level 3 Communications) to expand existing telecommunications infrastructure at 315 Ballinger Center Drive in Ballenger Creek.

Ryan Jolene, representing Level 3/Lumen, said the site is part of a national initiative covering 118 projects to expand capacity and…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans