Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Capitol restoration progresses: fourth-floor work, glass floor installation and dome inspection move forward

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Michigan State Capitol Commission heard updates on ongoing restoration projects including decorative painting on the fourth floor, glass-floor installation in the rotunda, a drone inspection of the exterior dome and a study of voltaic skylights.

The Michigan State Capitol Commission on an unspecified 2025 meeting heard an update from Executive Director Rob Blackshaw on the status of multiple restoration projects at the Capitol, including fourth-floor decorative painting, glass-floor installation in the rotunda, and a drone inspection of the exterior dome.

Blackshaw said the fourth-floor east-side restoration is under way and that Evergreen was selected as the decorative-painting contractor. He said technicians opened portions of the west-side plaster to inspect cracking in the grand stair archways and found matching cracks in the underlying brick; engineers currently say the arches do not need structural reinforcement but the…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans