Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Hvac Replacement topic

No spam. Unsubscribe anytime.

DDA approves HVAC replacement at 819 D Forest Park Way, awards work to A and D Horizon

3447079 · May 22, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Downtown Development Authority voted to approve replacing the old HVAC unit at 819 D Forest Park Way, accepting a $12,900 quote from A and D Horizon after reviewing a higher quote from Ares MEP; the motion passed on a roll-call yes vote from multiple board members.

The Downtown Development Authority voted to approve replacement of an HVAC unit at 819 D Forest Park Way, awarding the work to A and D Horizon. The motion to accept staff’s recommendation was made by Jacqueline Faith and seconded; a roll-call recorded “yes” votes from Angeline Butler, Kathleen Faith, Nancy Howard and Jay Evans.

Procurement staff reported the DDA received a quote from A and D Horizon for $12,900 to replace the aging unit installed in the building used for the Elevate program. Staff also obtained a second quote, from Ares MEP, which was reported in the transcript as “18.02 60”; staff characterized that figure as roughly $6,000 more than A and D Horizon’s price. Lisa, procurement staff, told the board A and D Horizon had previously performed renovations at the building and that the existing unit was old and was patched to be operable for the Elevate ribbon-cutting.

Board members asked about warranty and operational status. Procurement staff said the vendor included manufacturer warranty language in the quote and that installation-warranty details (for example a 90-day installer warranty) would be confirmed. Staff said the unit had tripped a breaker during the event because of extra electrical load and that the reset was a temporary fix.

The motion to accept A and D Horizon’s quote was moved by Jacqueline Faith (board member) and seconded. Roll-call responses recorded by the clerk showed Angeline Butler, Kathleen Faith, Nancy Howard and Jay Evans voting yes. The transcript does not record other members’ votes or a final tally beyond those recorded yes votes.

The board directed staff to confirm installation-warranty terms and manufacturer warranty details with the vendor prior to finalizing the contract. No dollar-amount change or amendment to the motion was recorded in the transcript.