Summary

Consultants presented a jail needs assessment showing aging 1939 sections, classification and space shortfalls and a planning-level estimate near $120–125 million for a new facility with a 224‑bed option. County and consultants urged moving to detailed programming and design to refine scope, costs and schedule.

Consultants and county officials presented a multi-year needs assessment for the Chautauqua County Jail during the Audit and Control Committee meeting on May 22, outlining deteriorating conditions in the facility’s oldest sections and offering a planning-level replacement option.

Sheriff Jim Cuatro told the committee that parts of the jail dating to 1939 “are rapidly failing,” and said maintenance work has kept the facility operating but is increasingly expensive and reliant on custom parts and ad‑hoc repairs. The sheriff and consultants said the deteriorating condition complicates staffing, programming and compliance with state correction standards.

LaBella Associates and Justice Planners presented a data-driven review of bookings, length-of-stay and population trends from 2016–2022 and several forecast scenarios. Consultants said a baseline forecast projects a modest decline in average daily population under current conditions, while alternate scenarios that restore pre‑COVID booking or length‑of‑stay levels would increase demand. The team produced a range of bed needs from roughly 152 beds (baseline, excluding federal inmates) to as many as 316 beds in a high-use scenario that included federal detainees.

The county and consultants identified a preferred planning option that centers a new building behind the existing complex and salvages usable space in the 1970s and early‑2000s additions. The concept provides capacity for about 224 beds while preserving the ability to expand later if needed. The macro program called for roughly 114,000 square feet of program and housing space in an overall concept; consultants flagged this as a high‑level estimate requiring a room‑by‑room program and an updated cost model.

Cost estimates: consultants reviewed previous cost opinions and current market conditions. Base construction costs cited ranged near $640–700 per square foot; when construction contingencies, soft costs, fees and escalation are included, the planning estimate approaches approximately $1,000 per square foot. On that basis, consultants gave a project-level order-of-magnitude of roughly $120–123 million for the preferred 224‑bed option, excluding any future escalation if construction is delayed.

Next steps recommended by consultants: proceed from this concept to a detailed programming phase that documents room-level needs and staff requirements; refine site layout and utility/tunnel connections (including the secure tunnel to the courthouse); develop a detailed cost estimate with an agreed escalation schedule; and produce a construction and staging plan that minimizes disruption to operations.

County officials said the presentation will be shared with the full legislature and that staff hope to avoid losing momentum on a project that will require multi-year planning and significant capital funding.