Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Amarillo staff outline plan to replace Hollywood treatment plant and upgrade River Road amid growth projections

3522280 · May 27, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

City staff and consultants told council a new Hollywood-area water resource recovery facility and upgrades to River Road are the recommended path after a multi-year condition assessment; conceptual combined estimates ranged widely and staff said more engineering and permitting work is needed before cost certainty.

City staff and engineering consultants presented a high-level plan on May 27 for wastewater infrastructure that calls for constructing a new, modern facility at the Hollywood site, upgrading collection and lift station infrastructure and keeping River Road operational until the new plant is completed.

The long presentation reviewed the age and history of both plants (River Road traces to the 1920s, Hollywood major expansion completed in the 1990s), regulatory changes since the Clean Water Act and TCEQ rules and the agency's 75%/90% flow thresholds that require municipal planning and construction to accommodate growth. Staff said both facilities consistently operate near 75% of permitted capacity and that reaching 90% would trigger…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans