Following public inquiry, the board directed staff to identify two siren locations and return with firm quotes; a single siren quote was cited at roughly $42,804 not including electrical work.
Get email alerts on the Public Safety topic
No spam. Unsubscribe anytime.
Public Safety Chief (title as given in the meeting) presented options for adding outdoor warning sirens and asked the Type B Board for direction on whether to pursue funding for one or two additional units.
The chief said the city currently has one functional siren and that a sound-engineering map identifying several candidate sites was on the board’s table. He told the board a quote he previously received (which had expired in April) priced a single siren at about $42,804, not including electrical hookup costs. The chief said electrical availability, the need for easements or rights-of-way, and site-specific variables would affect total project cost and that costs could be substantially higher where electric service is not immediately available.
Board discussion identified a preferred primary site near the water tower on the north side (Old Mansfield Road / north side) and another candidate near Wallen Park on the south side; members noted an existing nonfunctional siren head at Wallen Park and the possibility that a generator would be needed there because of missing electric service.
A board member moved to direct staff to pursue two siren locations (one at the identified north-side water tower site and one additional location near Wallen/Wall en Park) and obtain quotes; another member seconded the motion. The chair confirmed that staff would return with numbers for a future formal vote and that public hearings would be required before final installation. The transcript records the motion and a second and the chair’s confirmation that the board had given direction.
The chief recommended using the same rotating-head model already installed (the same model that sits on South College) for consistency with the sound maps; he noted larger or alternative systems are possible but would increase cost. Board members emphasized power availability as a key cost driver and asked staff to return with detailed quotes that separate equipment cost from electrical/site work.
Staff will return with firm quotes, site-specific electrical estimates and any required easements or right-of-way needs for the board to vote on at a future meeting.