Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

City to conduct smoke testing in Lynn Lane wastewater subbasin to find sewer inflow and infiltration

5387735 · July 14, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The utilities department will perform smoke testing in a wastewater subbasin near County Line/Kenosha to locate faulty connections and reduce stormwater inflow to lift stations; work is expected to take three to four weeks and will be publicized to residents.

Broken Arrow utilities staff briefed the governing body on planned smoke testing in the Lynn Lane wastewater treatment subbasin (LL30/LL33) to locate inflow and infiltration points and identify line failures that allow rain and groundwater into the sanitary system.

Charlie Bright, director of engineering construction (working with utilities), described the work: crews and a contractor will pump smoke at manholes and watch for where smoke exits yards, drains, roof…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans