Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Commission conditionally approves 6,000-square-foot office at Third and Curlin

3585791 · May 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission granted preliminary/final conditional approval for a 6,000-square-foot office building at 607–629 West Third Street, consolidating 10 lots into a single 31,972-square-foot parcel; approval is subject to engineering, utility and landscape details.

The Chester City Planning Commission on Feb. 5 conditionally approved a land-development plan to consolidate 10 lots and build a 6,000-square-foot office building at 607–629 West Third Street, subject to standard engineering and permitting conditions.

Applicant Rick Zylo (represented by architect/engineer Sean Paul) described revisions made since the project’s prior presentation: clarifications to ADA ramp and sidewalk details at the Third-and-Curlin intersection, refinements to the stormwater managed-release design with an 8-inch PVC outfall and trash-wrap orifice to Delcora, and relocation of utility tie-ins to…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans