Commission approves Firelight Planning Area 6 lot sizes and setbacks, with minor corrections required
Summary
The commission approved lot sizes and setbacks for Firelight MPDO Planning Area 6 (a non‑55+ subarea aimed at younger families), subject to correcting several lots that did not meet the minimum 50-foot width in the submitted plan set.
Get email alerts on the Firelight Mpdo topic
No spam. Unsubscribe anytime.
The Toquerville Planning Commission approved the lot sizes and setbacks shown on the site plan for Firelight MPDO Planning Area 6, with a requirement that several lots be corrected in the plan set to meet the MPDO preapproved standards.
Nut graf: Under the city’s MPDO/NPDO framework, the planning commission’s review focused on lot widths and setbacks. Staff and applicants presented a plan showing typical lot dimensions, a small park/active-recreation area to be dedicated to the city, and a product mix targeted to younger families rather than the community’s 55-plus housing typology.
Staff explained that the MPDO restrictions provide “preapproved” standards; if a submitted plan meets or exceeds those standards, the plan checks the appropriate box for commission approval. Planning staff and the applicant showed typical lot widths of 50 feet and depths of about 100 feet on the smallest lots, and staff noted an open-space/park parcel intended for dedication to the city within the planning area.
Commissioners and staff identified a handful of drafting errors in the plan set — for example Lot 103 was shown at 43 feet wide in the submitted drawings — and asked the applicant to revise the plan before final plat approval. Commissioners clarified this action was the first step in a multi-stage review; subsequent preliminary-plat and infrastructure approvals will follow at the city-council and engineering-review stages.
Motion and outcome: A commissioner moved to approve the lot sizes and setbacks for Planning Area 6 subject to bringing the noncompliant lots into compliance with the MPDO preapproved standards; the motion was seconded and passed by the commission.
Ending: Staff said the application will continue through the city’s phased review; city council will review other aspects (open-space dedication, infrastructure and development-agreement limits) before building permits or final plats are recorded.