The Carson Planning Commission voted 8‑0 to approve a 3,146‑square‑foot drive‑through car wash on a 2.5‑acre parcel at 17455 Central Avenue, approving site plan/design review 1747‑18 and conditional use permit 1076‑18 with operating hours limited by municipal code.
Get email alerts on the Development Permits topic
No spam. Unsubscribe anytime.
The Carson Planning Commission voted 8‑0 to approve site plan and design review 1747‑18 and conditional use permit 1076‑18 to allow a 3,146‑square‑foot drive‑through car wash at 17455 Central Avenue.
Planner Richard Garcia presented the project and told commissioners the proposal would replace an existing Chevron station and McDonald’s on a roughly 2.5‑acre parcel. The proposed car wash building would be sited on the west side of the lot. The facility would include a two‑lane drive‑through with queuing capacity of about five to six vehicles per lane, and 10 self‑service vacuum stalls, new landscaping and a trash enclosure. Hours of operation would be governed by Carson Municipal Code Section 9.13.8.14 (8 a.m. to 8 p.m.). Public notice was mailed to property owners within 750 feet and staff found the project categorically exempt under CEQA Guidelines Section 15303 (new construction of small structures).
Applicant Kevin Netti told the commission he had installed additional cameras and said criminal activity behind the site had fallen since he increased surveillance; he asked the commission to allow development to replace what he described as illegal activity on the rear lot. Architect Richard Bridal described the car wash’s water‑recycling system, saying the facility would recapture and treat runoff in a clarifier and pump roughly 70% of the water back for initial rinses, with lower recycling rates possible on extremely hot days.
Commissioner Aguirre, noting the site is in her district, said the applicant committed to hire locally if the project moves forward. Commissioner Wilson asked the applicant’s representative for additional details on the water‑recycling system; Bridal answered questions about the clarifier, sediment settling and the reuse process. No members of the public spoke against the project during the hearing.
Commissioner Huff moved to approve staff’s recommendation and Commissioner Johnson seconded. The roll call vote was unanimous (8‑0), and the chair declared the motion carried.
The commission’s approval authorizes the specific site plan and conditional use permit described in the staff report; applicable conditions of approval and standard design overlay requirements listed in the resolution will apply to building permits and inspections. No timeline for construction was specified at the hearing.
Votes at a glance: design overlay review 1747‑18 and conditional use permit 1076‑18 — approved, 8‑0.