Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Meeting Votes topic
No spam. Unsubscribe anytime.
Design Review Board approves several facade and signage plans; defers Beagle School window decision
Summary
The Saratoga Springs Design Review Board met May 14 and approved multiple façade and signage applications while deferring the final decision on Second Floor windows for the Beagle School and tabling a driveway matter remanded by a state court.
Get email alerts on the Meeting Votes topic
No spam. Unsubscribe anytime.
The Saratoga Springs Design Review Board met May 14 and approved several routine and substantive agenda items while deferring or tabling two matters for further review.
The board approved the April 30 meeting minutes. On the consent agenda the board approved a signage application for 9 Hampstead / 60 Weibel Avenue (Springs Family Veterinarian Hospital).
On the regular agenda the board approved exterior alterations and a backlit, raised aluminum sign for Clancy's Tavern at 43 Caroline Street. The board also approved finishing details to a previously conditionally approved one-story side addition at 153 Van Dam Street with specific conditions (see below).
The board approved the project for 115 Regent Street (the Beagle School) in all respects except it postponed a final decision on all Second Floor windows so the applicant can return with additional information and options. The discussion focused on safety requirements for pre-K classrooms and whether historic wood windows can be altered or retrofitted to meet New York State Department of Education and building-code guidance on tempered glass, sash-limiters and emergency egress.
The application for driveway work at 115 Circular Street (Trimarche/115 Circular) was discussed at length after a state court (Judge Walsh) vacated the board’s earlier approval and remanded the matter to the board to explain two points: why color photographs were not required and whether permeability was within the board’s authority at the time of the original action. The board decided to table further action and said members would review the record and return with a focused written determination addressing the court’s two questions.
Votes and motions (as recorded in the public transcript): - Approval of April 30 meeting minutes — motion made and seconded; minutes passed. (mover: unnamed in transcript; second: Mr. Wood.) - Consent item: 9 Hampstead / 60 Weibel Avenue (Springs Family Veterinarian Hospital) — signage approved. (mover: Chair; second: Mr. DeBoeuf.) - 43 Caroline Street, Clancy’s Tavern — approval of exterior modifications and signage as submitted. (motion seconded; outcome: approved.) - 153 Van Dam Street — approved finishing details to a previously conditionally approved one-story side addition with the conditions that aluminum-clad wood windows be used and that a louvered vent be added on the east elevation addition; LP (composite) siding to be smooth per application. (mover: Mr. Duboff; second: Mr. Wood; outcome: approved with stated conditions.) - 115 Regent Street (Beagle School) — board approved the application as submitted except that all Second Floor windows were excluded from the approval pending further study and a return to the board to resolve safety and preservation questions. (mover: Mr. Wood; second: Mr. Bennett; outcome: approved with exception.) - 115 Circular Street (Trimarche driveway) — matter tabled; board to review the court decision, the record and whether additional information (property-line survey, prior photographs) is required before issuing a written determination addressing the two issues identified by the court (color photographs; permeability authority). (no formal final outcome reached; staff to assist.)
Staff and board members asked applicants to provide clarifying materials where relevant (window specifications and hardware for the Beagle School; property survey and any pre‑work photos for the driveway matter). The board said it will prepare written language addressing the court’s remand and expects applicants to return with requested follow-up materials when available.
