Council approves consent agenda items 7–12 and 14–30, tables item 13; several consent items discussed during Q&A
Summary
The council approved the consent agenda covering items 7–12 and 14–30 (tabling item 13) after public questions about professional services contracts, drainage and stormwater studies, asbestos abatement funded by a TIF, demolition of Calvary Baptist Church, Fire Station 11 waterline design, and other items. The motion carried in open session.
Get email alerts on the Consent Agenda topic
No spam. Unsubscribe anytime.
The Grand Prairie City Council on May 6 approved the consent agenda items 7–12 and 14–30 and tabled item 13 to a later date, following public questions and staff explanations on several consent items.
The council’s consent vote followed extended public and council inquiry on several individual items. Questions and staff responses during the consent discussion included:
- Professional engineering on an as-needed basis (item 8): Director of Transportation and Mobility Carol De Vries explained the city used a Request for Qualifications process (not a dollar bid) for on-call engineering, notifying 1,535 vendors and receiving 14 responses; two firms were shortlisted to permit rapid response for smaller street/drainage/storm projects. The as-needed contract allows up to $500,000 in aggregate but carries no guaranteed spending; funds are encumbered only when specific projects arise.
- Neighborhood drainage study (item 14): Director of Engineering and Utility Services Noreen Housewright described a proposed stormwater/drainage study priced at $103,820 to evaluate topography and options for a neighborhood lacking drainage infrastructure; the study would produce ranked options and cost estimates and would be used to decide subsequent design and construction priorities.
- Stormwater utility fee review (item 12): Staff explained the $79,000 contract would fund a review of stormwater operations, maintenance and capital-improvement needs and provide a five-year evaluation with pricing options for council consideration; staff clarified stormwater fees are a locally determined funding mechanism (not direct EPA matching funds) and current residential example: an 1,800-sq-ft home pays about $4.69 per month under present rates.
- Water/wastewater line design for Fire Station 11 (item 17): Staff said the $101,000 is engineering/design-related (not the construction line cost) and that the 24-inch water main work from Davis Road to Prairie Ridge is under construction and expected to be substantially complete by the end of summer and fully complete by year end; the fire station construction was a part of the bundled project and the station will have water service when the line is completed.
- Asbestos abatement and 421 West Church Street property (HP Environmental) and demolition (items in consent tied to downtown redevelopment, e.g., Calvary Baptist Church demolition item 24): Public Health Director Cindy Mendez said the asbestos abatement contractor will abate the Willie Williams building (city-owned property at 421 W. Church St.) and funding is through a TIF (tax increment financing) fund (economic development fund, not general fund). The council also discussed the Calvary Baptist Church transaction: staff said the city purchased the church property as part of an assembled redevelopment area and estimated prior purchase price on the order of $5 million (council said the purchase had been voted years ago); demolition and asbestos-remediation schedules were described, with asbestos remediation starting in May and demolition slated afterward.
- Justice Assistance Grant (JAG) allocation (consent item): Staff explained Dallas County administers this Justice Assistance Grant allocation and portions were distributed to county and city partners; one purpose noted for local funding was updating in-car computers for law enforcement vehicles.
- Epic Central pond fishing restriction (item 27 discussion): Parks staff explained the amendment would clarify that the parks director has authority to designate no-fishing areas (the alluvial pond was already posted as no fishing because of safety and equipment concerns) and that additional signage will be added; staff agreed to investigate accessibility concerns for people using wheelchairs or walkers and report back if improvements are required.
- Speed limit change request from 60 to 65 mph on a TxDOT corridor (item 30): Transportation staff said TxDOT conducted the corridor study and all three affected cities (Grand Prairie, Mansfield and Midlothian) must pass ordinances for TxDOT to change signs; the segment in Grand Prairie is just under a mile.
Mayor and staff clarified the agenda-posting and legal processes during the consent discussion; the final motion approved items 7–12, tabled 13 and approved items 14–24 (with additional verbiage to 25), and 26–30. The vote carried in open session.