Summary

The Zoning Board of Adjustments unanimously approved variances to allow a 30‑foot‑wide, 780‑square‑foot carport to be attached to an existing garage at 1651 Ernie Lane; staff said similar structures exist in the neighborhood.

The Grand Prairie Zoning Board of Adjustments on April 21, 2025, unanimously approved a request allowing a carport at 1651 Ernie Lane to exceed the usual width and area limits so it can attach to an existing garage and provide easier access for the homeowner.

Staff presented the case and said the board received two returned notices in favor and none in opposition. Erin (planning staff) told the board the property is zoned single‑family and that the applicant seeks to increase the maximum carport width from 26 feet to 30 feet and the maximum area from 500 square feet to 780 square feet. "In the surrounding neighborhood there are several other structures, accessory structures that are very similar," Erin said.

Applicant Debbie Johnston told the board the larger width is needed so her husband, who uses a walker, can access the vehicle without stepping onto grass. "The reason I want 30 feet is because the structure is 30 feet ... My husband uses a walker and for him to be able to get out and not onto the grass would be very helpful," Johnston said.

Details and process: staff said 14 notices were mailed, with two returned in favor and none in opposition. The board approved the variance by voice vote; the motion passed 9-0.

Formal action: David Baker moved to close and approve ZBA25030021; Timothy Apatapo seconded. The motion carried, 9-0.

Next steps: approved applicants must still obtain any required building permits and comply with city permitting and inspection processes.