Carroll County’s facilities director reported progress on a village water-main installation and described plans to drain and repair the county water tower, a work sequence that may require up to two weeks of altered service and temporary tanks to protect fire flow for the nursing home.

Carroll County’s facilities director provided a detailed update on April 21 about ongoing water‑system work tied to a village main installation, water‑tower repairs and related steps to protect domestic and fire‑flow service during the project.

Why it matters: The work affects residents connected to the new distribution main and the county’s nursing‑home fire‑suppression capability while the water tower is drained and repaired.

What staff reported: The main installation down in the village is largely in place and crews were working on service curb stops for individual homes. A live tap across a major roadway had been completed earlier in the project, and staff said the main could be finished by the end of the week from the contractor’s schedule.

On the water tower, the county’s consultant and contractor plan to drain the tank to perform repairs and internal work, then let the repairs cure and chlorinate the tank before refilling. Staff said the turnaround could be “up to two weeks” in the contractor’s estimate and that the county is planning contingencies to maintain fire protection during that period.

Facilities Director Murray said the county is considering placing temporary tanks near the facility — initially estimating 10,000 gallons total (four 2,500‑gallon tanks) but noting the need may rise to 12,000–15,000 gallons after more accurate meter data. Murray said the temporary tanks would be piped and tied into the system so pumping systems could maintain domestic and fire‑suppression supply.

Murray flagged scheduling items: elevator repairs likely in late May or June, roof work planned for May/June for the jail, and RFPs issued for mattresses and a wheelchair van. He also reported progress on meter installations, hydrant installations and wastewater control‑box replacements, and noted intermittent vendor or manufacturing delays for some wastewater control components.

What commissioners directed: Commissioners asked staff to finalize plans for temporary water supply during the tower outage and to coordinate with emergency‑services stakeholders to ensure fire protection, particularly for the nursing home.

Next steps: Facilities staff scheduled an updated meeting with the contractor for the following day to confirm timelines and to refine tank‑size and pump requirements; staff said they will report back once the firm plan for temporary tanks and fire protection is ready.