Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Parks Operations topic
No spam. Unsubscribe anytime.
Parks board backs replacement of tracked amusement train with on‑land wheeled train for 2026
Summary
The Oshkosh Advisory Parks Board recommended replacing the park’s tracked amusement train with a new on‑land wheeled train for 2026, citing lower maintenance needs and broadened route options along park trails.
Get email alerts on the Parks Operations topic
No spam. Unsubscribe anytime.
The Oshkosh Advisory Parks Board voted on Aug. 11 to recommend replacing the tracked amusement train with a new on‑land wheeled train to operate in Menominee Park beginning in 2026.
Parks staff described the proposed vehicle as a four‑car train (each car holding six passengers) with an accessible end car featuring a drop‑down ramp for wheelchairs and mobility devices. Staff said the unit is narrower than many off‑road vehicles (about 42 inches wide) and the department envisions operating it mainly on park trails but possibly on some roadway sections when appropriate. “It gives us the potential for… a realistic train ride,” a staff speaker said when describing possible routes and staging.
Supporters said an on‑land wheeled train requires less track maintenance and could offer operational flexibility and potential sponsorship or fundraising opportunities. The city has received donor interest and preliminary funding commitments for the new train, staff said. Parks staff also noted staffing and seasonal scheduling would be part of budgeting for 2026 operations.
A motion to pursue the on‑land wheeled train proceeded after board discussion about trail widths, route options and reuse of the old track/gravel base for pedestrian trail conversions. The motion was moved and seconded; a voice vote recorded Amy Davis, Becky Metz, Tim Franz and Steve Herman voting aye. The motion carried.
Staff said the tracked engine on site dates to the 1950s and carries high replacement and maintenance costs; removing the track would let the city convert the corridor and reduce ongoing track upkeep. City staff intend to include the new train in the 2026 operating budget and will present the plan and budget to the common council during the budget process.

