Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Parking And Assets topic

No spam. Unsubscribe anytime.

Trustees approve $79,500 engineering contract for parking-repair cycle with Wallace Design

5475009 · July 24, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a proposal with Wallace Design for engineering services related to structural repairs across the Partner Tulsa parking system; services will be drawn from an existing $2.5 million budget and documents are expected by November.

Trustees approved a $79,500 contract with Wallace Design for engineering services to prepare construction drawings and provide construction administration for the next cycle of structural repairs across the Partner Tulsa parking garage system.

Nia presented the request, explaining the scope follows the structural capital repair report presented to the board earlier in the year. The scope includes production of construction documents and construction administration; the city of Tulsa’s engineering services will lead bidding and inspection, and staff will return to the board with a recommendation for a contractor once bids are received.

The $79,500 professional-services fee will be drawn down from an already-approved $2,500,000 budget amendment for parking repairs. Wallace Design has participated in prior cycles and carries background knowledge of the garages; staff said Wallace expects to complete repair documents by November. Trustees approved the contract by roll call.

Votes at a glance: trustees approved the Wallace Design engineering services agreement by roll call (recorded yes votes include Craig Abrahamson, Paul Bracey, Councilor Ringle, Eliana Hurtado/Tatum, Andy McMillan, Ashley Phillipson, Katie Plahockey, Erin Parsley, Terrell Siegfried).