Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Residential Design Variance topic

No spam. Unsubscribe anytime.

Oshkosh planning commission approves front‑yard patio variance at 1907 Crane Street

3806523 · April 15, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning Commission approved a variance to allow a patio on the front facade of a single‑family home at 1907 Crane Street after staff said site constraints limited rear‑yard options.

The Oshkosh City Planning Commission voted to approve a variance to the city's residential design standards allowing a patio on the front façade at 1907 Crane Street. The motion to adopt the findings and recommendations in the staff report carried unanimously.

Staff told commissioners the 1,217‑square‑foot single‑story home, built in 1939, sits on a 13,500‑square‑foot corner lot at Crane Street and Columbia Avenue and that the house and driveway placement left "minimal rear inside yard area" for a patio. Staff said the proposed patio would meet principal structure setback requirements for the SR‑9 zoning district and would not project closer to the front property line than the neighboring house to the north. A six‑foot privacy fence is included in plans to screen the patio from the right of way and neighboring properties.

The applicant, Seth Palmer, spoke briefly and said he had nothing to add beyond the application materials he submitted. Staff recommended approval, stating the existing layout created an unnecessary hardship by limiting where a patio could be constructed. The commission asked no technical questions during the public hearing and then moved to adopt staff findings.

The motion on the floor — to adopt the findings and recommendations as stated in the staff report — passed in a roll call vote with all eight members recorded as voting yes. No abstentions or no votes were recorded.

The approval allows construction of the proposed front‑facing patio subject to the conditions listed in the staff report. The staff report was entered into the record for the public hearing; it includes required setback confirmation and screening details.