Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Clermont County reviews materials, roofing trade-offs and security features for Filager campus Phase 2 and 3

6437774 · March 24, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Design team presented exterior and interior material options, roofing cost trade-offs and security glazing for the Filager campus expansion; renderings show options to match existing sheriff's building and choices could affect construction costs.

Designers and county staff presented material selections, roof options and security features for the Filager campus Phase 2 and 3 at the Clermont County Board of Commissioners meeting on March 24, 2025.

The presentation outlined options to match the existing sheriff's building with red‑orange brick—designers identified a Belden brick product as a close match—and proposed metal panel above brick at bearing height for the new engineer and facilities buildings. Presenters showed renderings with two exterior schemes: a darker bronze storefront and roof to match the sheriff's building, and a lighter panel and clear anodized aluminum option for a different contrast.

The discussion emphasized lifetime and cost trade‑offs…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans