Library officials presented a feasibility study that identifies infrastructure and accessibility needs after 30 years without a comprehensive renovation and said schematic design and cost estimates are underway.

Representatives of the Warsaw Community Library presented the results of a recently completed feasibility study and outlined facility needs, accessibility problems and next steps in preliminary design.

A library representative identified as Heather told the council the building’s last renovation was 30 years ago and the facility was originally built as a Carnegie library in 1917. She reported large increases in use: a 15% rise in cardholders, about 109,000 visits in the previous year and more than 10,000 program attendees. The library doubled study rooms from two to four and logged over 4,000 study-room uses.

The feasibility study lists several major facility issues: a complicated and inaccessible entry sequence requiring multiple stairs and elevators, congestion and insufficient parking with accessible spaces in poor locations, failing masonry and interior finishes, and mechanical and plumbing systems that the study labeled “poor condition” or in need of replacement. The presentation included photos that the presenter said illustrate crumbling ceiling plaster above the main circulation desk and other deferred-maintenance conditions.

The library has hired an architect and is developing a schematic design; Heather said the architect expects to provide an estimated project cost by May. The study recommended a comprehensive renovation to maximize return on investment and reduce the cumulative cost and disruption of piecemeal repairs.

Ending Library officials asked the council to note the study, and offered to provide tours of the building to illustrate the identified needs. Council members asked about cost estimates and whether the library intended to remain in its current location; the presenter said remaining in place is the likely approach given the scale of investment.

Speakers quoted - "It has been 30 years since the library's last renovation…" Heather (Warsaw Community Library representative).

What was not specified - The feasibility study identifies needs and recommends a comprehensive renovation; the meeting transcript does not include a cost estimate — the presenter said an estimate should be available by May.