Board approves rehabilitation plan for 1 Palm Row but bars proposed copper roof; requires galvalume 5‑V profile

2722717 · March 20, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After extensive discussion, the board approved rehabilitation work at 1 Palm Row with conditions including use of a 5‑V galvalume roof profile (not copper), clay pavers, Marvin-clad windows on the secondary addition, and documentation/clarity about reconstruction of a deteriorated coquina wall.

The Historic Architectural Review Board on March 20 approved a major rehabilitation plan for 1 Palm Row with multiple conditions focused on materials and preservation of streetscape character.

Staff and the applicant discussed a range of changes: replacement of a porch and roofs, re‑cladding a CMU rear addition with novelty wood siding, replacement and repair of windows, reconstruction of a deteriorated coquina wall along the east property line, and installation of a new paver driveway. The applicant proposed a standing‑seam copper‑colored finish for the roof; the board and staff rejected a colored standing seam or faux copper finish for the grama‑vernacular roof and instead required a traditional 5‑V crimp metal panel in a galvalume finish or an approved low‑profile standing seam only where historically documented.

Other conditions in the board’s approval included: use of Marvin (aluminum‑clad) windows on the nonhistoric rear addition while restoring original wood windows on the main house; clay brick pavers (running bond) for the new driveway; matching novelty wood siding on the former CMU addition; replication or repair of the existing shutters; and additional archaeological monitoring and documented approach for reconstruction of the coquina wall (board asked that reclaimed material be reused where possible and that staff be provided a plan for any new block or cap details). The motion, made and seconded during the regular agenda, passed on roll call.