Commission approves 10-year gravel-extraction permit for Big Dipper Construction on Fairview Loop

2665880 · March 18, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning Commission approved a conditional-use permit allowing Big Dipper Construction to extract roughly one million cubic yards of gravel from two adjacent parcels on East Fairview Loop, with conditions restricting truck routes and requiring mitigation of dust, noise and screening.

The Matanuska-Susitna Borough Planning Commission on March 17 approved a conditional-use permit authorizing earth-material extraction on two adjacent parcels near East Fairview Loop and East Brenda Avenue for a multi-phase gravel operation proposed by Big Dipper Construction.

Staff and the applicant said the operation would be phased, use existing topography and vegetative buffers to reduce visual and noise impacts, restrict hours of operation and rely primarily on East Fairview Loop for haul access; staff included a condition prohibiting use of specified residential streets for transporting extracted material.

Why it matters: Borough code requires review when material-extraction volumes, access and potential neighborhood impacts pose traffic, noise and environmental concerns; commissioners approved the permit with route and operational restrictions intended to limit impacts on nearby residential streets.

Rick Benedict, current planner with the Development Services Division, told the commission the applicant proposes extraction from two parcels totaling about 17.44 acres and that the application estimated roughly one million cubic yards of gravel to be removed over the permit period. He described operating hours as 8 a.m. to 5 p.m., Monday through Saturday during April 1–November 30, subject to seasonal weight restrictions and weather.

Tim Thiale, representing Big Dipper Construction, described a 100-foot buffer along the western property line for noise and light mitigation and said the pit bottom would be graded to drain internally. He told commissioners the company has applied for a driveway permit with the Alaska Department of Transportation for Fairview Loop access and said future redevelopment of the site could include residential, multifamily or commercial use.

Several nearby residents spoke in opposition to use of Brenda Avenue and Carefree Drive for hauling. Angel O'Connor said the narrative's "one trip per hour" estimate could amount to thousands of heavy-vehicle movements over the permit term and warned: "The traffic and noise would severely impact our quiet family lives and our little residential road." Dawn Macbeth said the roadway is already eroded and not suited for heavy machinery traffic.

Paul Minnick, the property owner, told the commission he has cleaned up the parcels since purchasing them and said he did not anticipate regular hauling out via Brenda Avenue: "We've never had a problem with our trucks ever driving on someone else's road Borough Road State Road or nothing... I mean I got a 6 foot high fence up... for the last 6 years, I've hauled sand out of there 24 hours a day. No one's ever complained." Benedict confirmed the record indicates the applicant removed derelict structures and junk from the properties prior to the application.

Staff recommended and the adopted resolution included a prohibition on using East Brenda Avenue, South Shannon Street, East Carefree Drive and South Campbell Street to transport earth materials; the record also shows staff recommended that East Burnett Avenue not be used for extraction activities. The operating plan includes dust-control measures (periodic water spraying), limited hours, vegetative buffers, phasing and retaining excavations below grade to reduce light and noise impacts.

Commissioner Glenn moved the resolution and Commissioner McCabe seconded; Commissioner Fernandez noted item 7 of the staff recommendations explicitly prohibits hauling on named residential streets. The commission approved Resolution 25-02 with no objections recorded.

Looking ahead: The resolution contains conditions and requires the applicant to secure or finalize driveway permits with state and borough authorities and to comply with the borough's reclamation and operational standards; staff will monitor compliance through standard permitting processes.