Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Planning And Development topic

No spam. Unsubscribe anytime.

Township issues building permits, hears engineer updates on culverts and subdivisions; schedules electronics recycling and ADA review

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Township staff reported several building permits and subdivision reviews, an extension request to May 8, progress and delays on culvert work, and scheduled an electronics recycling event and an ADA assessment.

Township staff and the municipal engineer updated the Huntington Township Board of Supervisors on permits, subdivision reviews and several road and stormwater projects at the Jan. 8 meeting.

Gus, a township staff member, said he issued a rooftop-solar waiver to resident Chad Reinhart; once installers determined the existing roof could not support the panels, the work was reclassified as a roof repair. He also reported issuing a building permit to Garmin Builders for a two‑story single‑family house at 115 Ami Drive and a permit to Kyle Smith at 95 Tammy Drive for 23 rooftop solar panels. Gus noted there remain two undeveloped lots at Long Springs.

"He got a permit to put rooftop solar, and after they started to find out the roof won't take it, he's gotta replace the roof. So that's considered repair," Gus said on the record.

Gus reported that JBI submitted a request to extend their review period; the board later accepted an extension to May 8. He also said the township will host an electronics recycling drop-off with Waste Management on May 17 from 10 a.m. to noon; that event was rescheduled after snow affected earlier pickup plans.

Engineer Scott updated the board on multiple drainage and permitting items. He said the Greenberger Road culvert is progressing slowly because of weather and the holidays and that he has not yet received comments from the Department of Environmental Protection on the Myers Town Road culvert initial submission. Scott confirmed the township received a permit for a rolling‑road culvert and that he conducted a stormwater installation inspection for Bone Springs, Lot 52.

Other planning items Scott listed included a sketch plan for the Dillard property on Roseburg Road (applying to PennDOT for driveway access), a stormwater management plan for a single‑family residence submitted by Austin Claybaugh, and a sketch plan from LCBM Corporation for a property at 2551 (address context not specified in transcript).

During public comment a resident asked about American with Disabilities Act upgrades to township facilities. The township reported that James Irving visited with the building code official and that an architect has been scheduled to survey the building and prepare drawings for any needed accessibility renovations.

Why it matters: Permits, subdivision extensions and culvert projects affect property development, drainage and road safety in the township. Scheduling for electronics recycling and ADA assessment provide services and accessibility planning for residents.

Ending: The board directed staff to continue processing permits and report back on permit-related items and stormwater reviews at the next meeting.