Keizer committee reviews project spreadsheet; green bike-crossing paint quoted at about $30,000, Virta ODOT work slated for 2025

2626753 · February 12, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The committee reviewed near-term active projects on Jan. 16, including a quoted $30,000 estimate to paint green bike-crossing markings at four intersections and an update that an ODOT Virta sidewalk project is expected to begin in 2025.

The Keizer Traffic Safety, Bikeways & Pedestrian Committee reviewed its project spreadsheet on Jan. 16 and discussed near-term items that will require budget advocacy or engineering work.

City staff and committee members said painting green bike-crossing hash marks where bike lanes cross intersections is a low-design solution that has been quoted at about $30,000 for four locations (two crossing markings at Lock Haven east/west of River Road and two at Chemawa). “We got a quote for $30,000 to do those four,” a committee member reported; staff said the sum might increase and that the work would require inclusion in the 2025 budget cycle.

Committee members also discussed other active projects: - River Road timing changes: Staff reported City of Salem plans to change pedestrian-signal timing along River Road to a two- to three-second staggered timing; staff said they will follow up with a status update. - Virta (ODOT) project: Committee members were told the ODOT Virta project and sidewalk widening is scheduled to start in 2025, pending the agency schedule and funding. - Rectangular Rapid Flashing Beacons (RRFBs) and other engineering treatments: Committee members noted RRFBs and rapid flashing beacons are effective but “not cheap” and said staff would supply cost estimates for RRFBs at a future meeting.

Committee members emphasized follow-through during the budget process. “We need to make sure that one of us shows up at the budget meetings to make the case,” a committee member said. Staff offered to keep the spreadsheet “pending” for items that need further analysis or funding.

Why it matters: Minor capital investments — paint, signs and beacons — can increase crosswalk visibility and cyclist safety, but they require budgeting and coordination with engineering staff and, in some cases, external agencies such as ODOT.

Next steps: Staff will confirm costs and timing for the green paint project and provide RRFB pricing for a future meeting. Committee members volunteered to advocate for funding during the 2025 budget cycle if needed.