Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Zoning Change Drive Thru topic

No spam. Unsubscribe anytime.

Plan Commission recommends ordinance amendment to allow drive-through at Carne Properties site

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The plan commission recommended the Village Board approve an amendment to PUD-3 that would allow drive-through operation for a proposed two-tenant building west of an existing car wash; the commission was told the design accommodates 6–8 stacked vehicles and provides parking above ordinance requirements.

The Village of Jackson Plan Commission on July 17 voted to recommend the Village Board approve Ordinance 25-08, an amendment to section 40-81-155 C for Planned Unit Development District PUD-3 to allow drive-through operations as a conditional use for a parcel owned by Carne Properties LLC.

A representative for Carne Properties, Mr. Hertzfeld of Design to Construct, presented drawings showing development of a two-tenant, standalone retail/restaurant building on green space west of the existing car wash. The representative said the design includes internal circulation between the car wash and the new building, parking that exceeds ordinance requirements for a split restaurant/retail use, and stacking for approximately 6 to 8 cars on the drive-through lane.

Commissioner Molkentin moved to recommend the ordinance change to the Village Board and Commissioner Hoffmeister seconded. Staff advised the commission that this ordinance action is a zoning change and that the applicant will still need to return for conditional-use and site-plan review; engineering review will be completed in concert with those later submissions. One commissioner recorded an abstention during the vote; the motion nevertheless carried.