Summary
City staff reported plans to replace aging force mains at Lift Stations 23 and 24, progress on a contracted animal shelter project, park restroom projects, and developer inquiries including a proposed stacking lane at a local restaurant and a micro hospital sign issue.
Get email alerts on the Municipal Infrastructure topic
No spam. Unsubscribe anytime.
City of Lake Jackson staff updated the planning body on several infrastructure and development projects, including force-main replacements, an animal shelter contract, park restroom projects and multiple development inquiries.
Public works and planning staff reported a planned replacement of the force main serving Lift Stations 23 and 24. “This was one of the cave-ins they found on that line…public works asked Nicole to draw up some plans for them to replace all that pipe,” a staff member said. Staff described a trenchless pipe-bursting method to replace the line and said the contractor expects to fuse and lay about 1,000 feet of pipe per day for the work.
On the animal shelter project, staff said the city has signed the contract with the shelter operator and issued a notice to proceed. An engineering mistake in grading required a revised plan; an engineer working with the project was identified as Miguel with Baker and Lawson and is preparing a fix to capture stormwater and reduce cost impacts for the shelter.
Staff also reported a parks restroom program, identifying Junior Service League Park and Garland Park as the next two parks scheduled to receive restrooms. The city is reviewing plans for these facilities.
Several development inquiries and private projects were discussed. A restaurant with drive-through stacking (RASCO) submitted new stacking-lane designs; staff said engineers have produced multiple iterations and an engineering firm will meet with city staff to finalize a design. Staff also reported a pending truck-stop site with a permit that is awaiting TxDOT approval; although the permit fee has been paid, staff said the project is contingent on TxDOT approval and a certificate of occupancy will not be issued without it.
Members discussed signage at a site where a “micro hospital” or small inpatient facility has been rumored; staff said signs had been installed and were asked to be taken down because no formal plans had been filed with the city. City staff said the micro hospital is “scuttlebutt” in the medical community and that developers or owners have not completed required city filings.
Staff also noted an offer has been made on the Alden (airport-adjacent) property; the mayor and council representatives are following up. Other items included updates on downtown surveillance cameras and progress on a Sycamore street project that is behind schedule because cold weather has delayed concrete pours.
Staff closed the update by noting they are reviewing emergency repair contracts to have on-call vendors for faster emergency response and better pricing.