Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Industrial Development topic

No spam. Unsubscribe anytime.

Plan commission approves 10,200‑square‑foot Blifford Lumber warehouse addition; narrow vote

2140619 · January 22, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission approved a 10,200‑square‑foot warehouse addition for Blifford Lumber at 2132 Southwest Avenue, with conditions to extend clerestory windows on key elevations and address engineering and fire department comments. Approval passed 5–1.

The Plan Commission approved final site plan and architectural review for a 10,200‑square‑foot warehouse addition to the Blifford Lumber property at 2132 Southwest Avenue at its Jan. 22 meeting, with commissioners voting 5–1 in favor.

Charlie (planning staff) described the proposal as a utilitarian warehouse expansion of an existing one‑story building. The addition would be about 27 feet tall (slightly taller than the existing 16‑foot structure), clad in standing‑seam metal siding to match the existing building, and require an expanded water service to support sprinklers. Staff asked the applicant to add clerestory or other windows along the east and north elevations to reduce the massing, and to address engineering and fire‑department comments.

Greg Prossen, design professional for the applicant, told the commission the project can demonstrate on‑site vehicle and fire apparatus turning radii and that the proposed windows will be placed where practical. Commissioners debated whether the north elevation would be visible from the public right‑of‑way; several members said the three clerestory windows facing West Avenue would improve the appearance, while others noted the broader industrial area contains many non‑ornamental buildings.

The commission voted to approve the plan subject to staff, engineering and fire‑department comments and conditional clerestory/window treatments as presented. The roll call was recorded as five yes votes and one no from Commissioner Keller.