Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Engineering costs near construction estimates for Crockett Road and River Oaks bridge repairs; design agreement proposed

2097731 · January 9, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

City staff recommended a design agreement with Barge Design Solutions to produce engineering for two bridge repair projects: the Crockett Road bridge over the railroad and the River Oaks Drive culvert/box culvert. Staff said engineering costs are unusually high relative to construction because of staging and traffic-control complexity; CSX will

City staff recommended that the commission authorize a design agreement with Barge Design Solutions for two bridge repair projects: Crockett Road (a bridge/railroad crossing showing approach settlement) and the River Oaks Drive box culvert/bridge.

Staff said the engineering portion of the Crockett Road repair is unusually large relative to construction because the work will be staged to maintain traffic and will require extensive traffic control, permitting and coordination with CSX. "In hindsight we could have considered putting that into the…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans