Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Stevens County engineer reports road maintenance plans, spillway study and grant applications

2085296 · January 7, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The county engineer updated the board on road maintenance priorities, mastic and sealcoat work, upcoming mill-and-overlay projects, a preliminary DNR/Houston Engineering study of a local spillway that could include rock riffles and water-level changes, and an upcoming Safe Routes to School infrastructure grant application due Jan. 17.

The Stevens County engineer briefed the board on ongoing and planned highway work, equipment updates and an early-stage DNR-led study of a local spillway.

Engineering and maintenance staff reported they have been routing and sealing cracks on County Roads 1, 13, 8 and 4, and that work to extend pavement life with routing, rubblized filler and sealcoating can add several years to a road surface. The county plans a mill-and-overlay on County Roads 13 and 8 and is preparing an ADA and sidewalk plan for a County 34 project; portions of that work will be submitted for a Safe Routes to School…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans