Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Wendell advances full-build design for Wendell Falls Parkway–Eagle Rock Road; accepts developer fee-in-lieu payments

2619978 · January 13, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Town staff presented a full-build design for the Wendell Falls Parkway and Eagle Rock Road intersection and the board accepted two developer fee-in-lieu payments to help fund turn-lane construction and related improvements.

The Wendell Town Board received a project update on design work for the Wendell Falls Parkway and Eagle Rock Road intersection and approved two fee-in-lieu agreements with developers that will contribute toward the intersection’s full build-out.

Planning staff said VHB, the town’s engineering consultant, is designing a full-build intersection consistent with the town’s transportation plan: four-lane divided roadways with medians, multiuse paths, and turn-lane configurations sized for future traffic. Staff told the board VHB will deliver 60% construction drawings in April…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans