Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Downtown Gateway Plan topic
No spam. Unsubscribe anytime.
Payson council, planners review Downtown Gateway and first active-transportation plan
Summary
Consultants presented a Downtown Gateway Plan and an accompanying Active Transportation Plan that recommend preserving Main Street’s small‑town character while guiding growth near a new I‑15 interchange and future FrontRunner station.
Get email alerts on the Downtown Gateway Plan topic
No spam. Unsubscribe anytime.
Consultants and city staff presented a Downtown Gateway Plan and Payson’s first Active Transportation Plan at a joint meeting of the Payson City Council and Planning Commission, laying out recommended street design changes, prioritized pedestrian and bicycle links, and land‑use guidance for parcels north of historic Main Street.
The study, led by WCG consultants and presented by Jeremy Searle, recommended restriping Main Street to add a center turn lane, modestly widen sidewalks and park strips, and add bulb‑outs on side streets to calm traffic and shorten pedestrian crossings. “We wanted to make sure that Payson Main Street remained a vital and vibrant corridor,” Searle said, describing goals to connect the historic downtown with new growth near a planned I‑15 interchange and a proposed Utah Transit Authority FrontRunner station.
The plan ties transportation, economics and land use together. Consultants said the area should focus on neighborhood‑scale retail and mixed uses within a study area stretching from the downtown to the new interchange, while larger regional commercial would likely locate at the interchange itself. The economic analysis found Payson’s taxable sales rose roughly 8.8% over the past decade and identified “sales tax leakage” patterns that shape what commercial types the gateway can support.
Why it matters: the corridor sits between historic downtown and planned major infrastructure changes — a new Nebo belt/Interchange on I‑15, a UVU satellite campus site, and a potential FrontRunner stop — that are expected to change travel patterns and development pressure. The plan aims to preserve Main Street’s small‑town character while guiding where higher‑intensity redevelopment should occur.
Key recommendations and details: - Street design: Re‑stripe Main Street to add a center turn lane, narrow travel lanes slightly to enlarge sidewalks/park strips for street furniture, planters and lighting. Bulb‑outs are proposed on side streets rather than in the state right‑of‑way on Main Street. - Connectivity: Extend a grid of local streets (labeled 1–4 in the study) to give alternatives to Main Street; explore reconnecting a signal toward the McDonald’s intersection as interchange reconstruction proceeds. - Active transportation: A prioritized network of buffered bike lanes, standard bike lanes and off‑street multiuse trails was proposed, with priority corridors identified for near‑term work and long‑term corridors reserved as opportunities arise with redevelopment or right‑of‑way projects. Searle clarified: “This is not the elimination of cars. This is not an attack on cars.” The plan is intended to add travel options and safer crossings. - Trigger sites and land use: The report identifies specific “trigger” parcels—including the 100 North/Main parcel, the 400 North (farmers market) parcel, and the Nebo School District parcel (referred to in the study as the school/transportation parcel)—as catalysts for shaping the area’s character. The consultant analysis suggested the school parcel would likely support multifamily housing in the long term to provide rooftops that help support neighborhood retail. - Historic overlay/code: The appendix includes a draft historic‑district overlay code to control building form, signage, streetscape elements and permitted uses; staff said the draft is a starting point for local refinements to protect the downtown character and limit undesirable uses at gateway parcels.
Points of debate and council comments: Several council members and attendees questioned density and building height near adjacent single‑family neighborhoods and asked for tighter controls in code language. Some speakers favored preserving low‑scale fabric on Main Street; others noted that rooftops are necessary to support in‑town retail and experiential food and retail venues. The consultants and staff emphasized the plan is a guidance tool and that zoning and redevelopment approvals remain under city control.
Timing and dependencies: Consultants said the interchange and beltway phases are currently in design and that the FrontRunner extension to Payson is being studied with a rough industry timeline discussed at the meeting of about five to eight years; no definitive schedule was provided by presenters. Several recommendations—trails, crossings and local streets—were presented as opportunistic projects to be pursued when redevelopment, UDOT work or right‑of‑way opportunities arise.
Quotes: Jeremy Searle, WCG consultant, said the study “took just over a year” and emphasized balancing safety and small‑town identity: “We wanted to make sure that Payson Main Street remained a vital and vibrant corridor.” On active transportation Searle said: “This is not the elimination of cars. This is not an attack on cars.”
Next steps: Staff and consultants asked council and planning commissioners for feedback to refine the draft overlay code and site concepts. The presentation materials and the draft overlay are in the study appendix; staff asked that further comments be submitted to city staff for follow‑up.
Ending: Council discussion continued through questions about specific parcels, design examples from other towns and how to sequence zoning changes or developer outreach. A packet and draft code were provided to the City for refinement; no formal zoning changes or land‑use votes were taken at the meeting other than a procedural adjournment at the end of the session.

