Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Lakeville board approves tight‑tank variance for half bath in garage at 8 Dazelle Road

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Lakeville Board of Health approved a variance from Title 5 to allow sanitary flow from a half bath and floor drains in a new garage to discharge to a 2,000‑gallon tight tank already serving floor drains and an oil/water separator; the approval requires yearly pumping reports and updated plans.

The Lakeville Board of Health on Dec. 18 approved a variance from Title 5 Section 15.26 allowing sanitary waste from a half bath and attached floor drains in a new garage at 8 Dazelle Road to be tied into a 2,000‑gallon tight tank, rather than routed to the house leaching field.

The variance was requested by the property owner and presented by the project engineer as a cost‑saving, site‑specific solution. The applicant and engineer told the board the garage is a personal hobby shop, not a commercial operation, and that the additional sanitary flow would be minimal. The engineer said trenching and pumping roughly 250 feet to reach the existing leaching field would be expensive — the applicant estimated about $15,000 — and argued it was more practical to…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans