Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Parks Recreation topic

No spam. Unsubscribe anytime.

Council directs staff to pursue feasibility study for proposed pump track at Moulton Meadows Park

5450332 · July 23, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Laguna Beach City Council on July 29 directed staff to move forward with a feasibility study and community outreach for a proposed bicycle pump track concept near Moulton Meadows Park, after hearing more than two dozen public comments for and against the plan.

The Laguna Beach City Council on July 29 directed staff to move forward with a feasibility study and community outreach for a proposed bicycle pump track concept near Moulton Meadows Park, after hearing more than two dozen public comments for and against the plan.

What was proposed: Staff and the Recreation Committee recommended a rubberized-asphalt ‘pump track’ — two interlocking tracks (one small for beginners and one larger for more experienced riders) — on a roughly 1-acre portion of the vacant land northwest of the Moulton Meadows soccer field, adjacent to existing trails and neighborhoods. San Clemente’s recently opened pump track was cited as a regional example. Staff said the track’s footprint is small relative to the four-acre parcel and that the project would include native-plant restoration and fencing, and would prohibit e‑bikes.

Public response: Supporters included bike-industry leaders, parents, youth-riding programs, and the Orange County Mountain Bike Association, who said pump tracks are low‑maintenance, family‑oriented facilities that reduce informal trail-building and benefit youth skill-building. Opponents — including Laguna Canyon Conservancy and residents near Moulton Meadows — urged staff to avoid the Aliso and Woods Canyon Wilderness Park footprint and warned against taking any designated wilderness or higher-value habitat without equivalent mitigation.

Council decision and conditions: Councilmembers directed staff to proceed with a feasibility study that includes: (1) initial civil/engineering review of the recommended site; (2) environmental screening and habitat restoration plans; (3) early coordination with Orange County Parks on boundary/land-transfer options and potential land swaps; (4) a fundraising plan that prioritizes private, nonprofit, and grant sources; and (5) interim measures for fencing, signage, and ranger involvement if the facility proceeds. Council emphasized getting a rough order-of-magnitude cost estimate from a civil engineer early in the study so the city knows whether the steeper city parcel options require significant earthwork/retaining walls and what that would cost.

Next steps: Staff will scope the feasibility study and return with the engineer’s preliminary cost and site options. Councilmembers suggested prioritizing the county‑land option but asked staff to evaluate other sites — including city property and an El Morro/Water District site — and to engage with the cycling community and conservation stakeholders on mitigation.